The project involved the construction of an office building (R+1). For this construction site based in Yaoundé, the political capital of Cameroon, the structure intervened as engineer of Studies and Follow-up of the Air-conditioning, Ventilation & Smoke removal. The construction site lasted one year (2014-2015)